Free schedule of values template
Build your AIA-style G703 schedule of values online, with the math doing itself, or download the blank Excel template with live formulas. Free, no signup.
Build your schedule of values, free
Enter your line items and the math does itself: completed to date, balance to finish, retainage, and totals. Then download a filled, ready-to-send PDF.
| Item | Description of work | Scheduled value | % Complete | Completed to date | Balance to finish | Retainage |
|---|
Private by design. Everything you type stays in your browser. Nothing is uploaded, stored, or seen by us.
Prefer a blank template?
The Excel version has live formulas. Type scheduled values and % complete, and everything else calculates. The PDF is a clean blank to print and fill by hand.
| Item | Description of work | Scheduled value | % Complete | Completed to date | Balance to finish | Retainage |
|---|---|---|---|---|---|---|
| 1 | General conditions | $24,000.00 | 100% | $24,000.00 | $0.00 | $2,400.00 |
| 2 | Sitework & demolition | $38,500.00 | 75% | $28,875.00 | $9,625.00 | $2,887.50 |
| 3 | Concrete & foundations | $61,200.00 | 40% | $24,480.00 | $36,720.00 | $2,448.00 |
| 4 | Framing & rough carpentry | $52,750.00 | 10% | $5,275.00 | $47,475.00 | $527.50 |
| TOTAL | $176,450.00 | $82,630.00 | $93,820.00 | $8,263.00 | ||
Excel = live formulas you fill in. PDF = a clean blank to print and fill by hand. Free, no signup.
What is a schedule of values?
A schedule of values breaks your contract price into line items. Each line gets a dollar value. As work gets done, you bill the percent complete of each line. It is the backbone of G702/G703 style progress billing: the continuation sheet on every pay application is your schedule of values with billing columns.
Schedule of values questions
Is this really free?
Yes. No email, no signup. Build it online or download the Excel or PDF and use it.
Does the Excel file do the math?
Yes. Completed to date, balance to finish, retainage, and the totals row are live formulas. You only type scheduled values and percent complete.
Will it match an AIA G703?
It follows the same column structure as a G703 continuation sheet, so it lines up with G702 style progress billing.
What line items should I use?
The builder includes starter line item libraries for commercial tenant improvement, electrical subcontract, and residential remodel projects. Load one and edit it to match your contract.
Stop re-keying your SOV every month
Build your schedule of values once in Werx and it flows straight into your G702/G703 style billing. Balances carry forward, retainage tracks itself, and each draw is one click. 14-day free trial, no credit card.
No credit card required · Free migration assistance · Cancel anytime
Disclaimer: These free tools and templates are provided for general information and estimating purposes only. All results — including quantities, material and cost estimates, load, sizing, and span figures, scores, and any guidance or warnings — are rough approximations that may not fit your specific project, site conditions, local building codes, or current prices. They are not engineering, architectural, structural, legal, financial, or other professional advice, and are not a substitute for a licensed engineer, architect, contractor, or other qualified professional. Always confirm quantities, sizing, and structural, electrical, mechanical, and code requirements with a licensed professional and your local authority having jurisdiction before purchasing materials or performing any work. Werx makes no warranty as to accuracy and accepts no liability for any decision made using these tools. Use at your own risk. See our Terms of Service.